For over 15 years, Simplex has been working successfully in the projects of elevators and mobile staircases installation for leading global manufacturers. Up to now, the company has successfully completed almost 1,200 installations in 20 different countries all over Western Europe. We are proud to install the first MULTI elevator that has the ability to move vertically and horizontally.
THE GRAND PALAIS, PARIS, FRANCE
ELEVATOR INSTALATION, 2024
The Grand Palais is a magnificent site at the heart of Paris. Built for the Paris Universal Exhibition in 1900, thanks to the most advanced construction techniques of the time, it is renowned worldwide for its magnificent nave and glass roof. More than 6,000 tonnes of steel were needed to build the nave. The Grand Palais, which had never previously benefited from a full restoration, is currently undergoing work and will reopen in 2024 to host the Olympic and Paralympic Games, where it will host the fencing and taekwondo events. Simplex Team will carry out the modernization and installation of two elevators, with capacity of 6t, 4 sops and 23m high.
Partner: OTIS
IN PROGRESS
THE OLYMPIC TOWER, MUNICH, GERMANY
ELEVATOR INSTALATION
Another modernization project, this time in Germany! The Olympic Tower in the Olympic Park, Munich has an overall height of 291 m and a weight of 52,500 tons. At a height of 190 m there is an observation platform as well as an exhibition commemorating the 50th anniversary of the Tower. Since its opening in 1968, the tower has registered over 43 million visitors (as of 2018). At a height of 182 m there is a revolving restaurant, which seats 230 people. A full revolving takes 53 minutes. The tower also serves as a broadcast tower, and has one Deutsche Telekom maintenance elevator with a speed of 4 m/s (13 ft/s), as well as two visitor lifts with a speed of 7 m/s (23 ft/s) which have a capacity of about 30 people per elevator. Simplex Team will carry out the modernization and installation of all three elevators.
IN PROGRESS
GIOIA 20 TOWER, MILAN, ITALY
ELEVATOR INSTALATION
The Gioia 20 Towers are a pair of multi-purpose towers that will add to the vibrant Porta Nuova region in Italy. The project comprises two towers named Gioia East Tower and the Gioia West Tower and it will be built to the greatest standards to provide residents with flexibility and comfort. It will feature a twin lift comprising two distinct cabins running in the same shaft resulting in shorter wait times and more efficiency. It is the first time such a lift is being utilised in an Italian project. The 65m-high Gioia West Tower will have 14 floors above ground and three basement levels. The Gioia Est tower with 24 floors and four subterranean levels will be 98m high. Simplex Team will install a total of 15 elevators, of which 6 are Twin elevators.
IN PROGRESS
HOPEN TOWER (Adria), PARIS, FRANCE
ELEVATOR INSTALLATION, 2023
Restructuring rather than destroying: a strong message at the heart of Paris La Défense. A new major redevelopment project is a makeover of the Adria Tower which is transformed into the Hopen Tower.
The result is a new, more modern appearance. The gray granite front will give way to a glass cover. The tower will be extended by three floors and gain extensions on the lower floors, which will be occupied by patios, terraces and gardens. Hopen Tower will therefore become a true destination, combining restaurants, shops, services and culture. At the top of the tower, the other flagship space of the whole: a restaurant open to the horizon, welcomes the general public and offers a unique view of Paris La Défense and the Greater West of Paris at a height of 150 meters. Simplex team is in charge of installing 8 Skyrise elevators with a load capacity of 1800kg from 21 - 48 floors.
Partner: OTIS
IN PROGRESS
THE LINK, PARIS, FRANCE
ELEVATOR INSTALLATION, 2023
Elevator Installation in a New Iconic Tower for Paris La Défense, in 2023, will be a new professional challenge for the Simplex team.
Project, The Link comprises two towers linked by 30 levels of green walkways. The 'Arche' wing will rise to 228 meters above Paris with 50 floors and the 'Seine' wing to 165 meters with 35 floors. The whole complex will rest on a common base of three levels between the urban boulevard and the forecourt. Employees will benefit from 130,000 sq.m. of office, restaurant, co-working and relaxation space. Simplex will install 16 Skyrise Double-deck elevators with a load capacity of 1600 kg from 23 and 24 floors up to 191,24 meters high.
Partner: OTIS
IN PROGRESS
ELBTOWER, HAMBURG, GERMANY
ELEVATORS INSTALLATION, 2023
With its 245 meters heigh, the Elbtower, will be the crowning glory for Hamburg's HafenCity. The tower will be the tallest building in Hamburg and the third tallest in Germany. The sculpture-like skyscraper will serve a variety of commercial and business purposes. In 2023. Simplex got the honor to install 43 elevators of which there is a special emphasis on the Shaft Climber installation along with 15 High speed elevators and one Panoramic lift, that will take you to the 55th floor.
MERLATA MALL, MILAN, ITALY
ELEVATOR INSTALLATION, 2023
Merlata Mall will be the beating heart of one of the largest areas with a mixed vocation: located north-west of the city it features residences, greenery, technology, business and commerce. New energies that merge in an extraordinary urban redevelopment project. In 2023 Simplex team will be installing a total of 23 elevators in the most innovative urban area in Milan, Italy.
It will be an honor for us to participate on a project in this lively place in the first Urban Smart District of Milan.FOUR FRANKFURT, FRANKFURT, GERMANY
Elevators installation, 2022-2024
In 2022 Simplex got the honour of installing 11 elevators at Four Frankfurt. Four ist the vision of a new city. Four unique skyscrapers represent urbanity without compromise. They shape and change the face of the metropolis of Frankfurt - with forward-looking architecture and a sustainable urban planning concept. In the midst of the skyline, neighborhoods are growing where living, living and working come together.
UNStudio / HPP ArchitectsTOUR PLEYEL, PARIS, FRANCE
Elevators installation, 2022-2024
Tour Pleyel is a skyscraper of mixed use, both residential and commercial, located in the commune of Saint-Denis in the suburbs of Paris, France. The tower is 129 metres tall. In 2022. Simplex will be in charge for installing 11 elevators.
Partner: OTIS
Financière des Quatre RivesTO LYON, LYON, FRANCE
Elevators installation, 2022 - 2023
The To-Lyon is one of the largest tertiary projects in Europe. It will provide offices, a four-star hotel, shops and services on the ground floor. To-Lyon tower will represent a landmark in the vicinity of the railway station and in the Lyon cityscape. Simplex got the honor to install 16 elevators of which 14 are Skyrise.
Partner: OTIS
© Archi GraphiPERGOLENVIERTEL, HAMBURG, GERMANY
Elevators installation, 2021- 2022
The Pergolenviertel extends over an area of 27 hectares from Hebebrandstrasse in the north to Alten Wöhr in the south. With around 1,700 residential units it is the largest new building district in the Hamburg-Nord district. Simplex is having a new business challenge installing 13 elevators.
MAX & MORITZ, BERLIN, GERMANY
Elevators installation, 2021
In Berlin we have started installation of 6 elevators in two residential towers Max&Moritz.
MAX - the southern residential tower: 23 stores, approx. 86 m high, approx. 23,100 m² area for apartments, offices, shops, restaurants, roof gardens and a pool.
MORITZ - the northern residential tower: 26 floors, approx. 96 m high - the tallest residential building in Berlin, approx. 21,100 m² area for apartments and businesses.
CITY GATE, GOTHENBURG, SWEDEN
Elevators installation, 2021- in progress
We have started a new project located in Gothenburg, City Gate tower updates the concept to reflect a modern city. Expected to rise 35 floors, the 50,000 m2 tower will become a defining element of the city skyline. Simplex will install 4 high-rise elevators with a load capacity of 1275 to 2000 kg from 14 to 38 floors up to 144 meters high.
BCP, CASABLANCA, MAROCCO
Elevators installation, 2021- 2023
January, 2021 we have opened a new construction site located in the southwest region of Casablanca in the heart of Casablanca Finance City, the Tour BCP project consists of the construction of the new headquarters of the Banque Centrale Populaire. The 27-storey high-rise tower with 7 high-rise elevators in the 23,957 m2. Simplex is having a new business challenge installing elevators with a load capacity of 1000 to 1275 kilograms from 8 to 32 floors up to 113 meters high.
EUROPAHAFENKOPF
BREMEN, GERMANYElevators installation, 2020 - 2022
We have opened a new construction site in Bremen, Germany. We have finished a project of installing 22 elevators in the 77,000 m2 Europahafenkopf complex, which will be the new headquarters of the Zech Bau GmbH. Simplex had a new business challenge installing elevators with a load capacity of 1000 to 1350 kilograms from 7 to 22 floors up to 75 meters high.
cobe.dkIN PROGRESS
PARK INN HOTEL
BERLIN, GERMANYElevators installation, 2020 - in progress
We contracted another elevator installation project in Berlin. The Simplex is installing 11 high-rise elevators in the Park Inn Hotel, the second-largest hotel complex in Germany and the tallest in Berlin. We are installing elevators with 18 and 21 floors and also high-rise elevators with 38 floors, a speed of 2 meters per second and transport capacity of 26 people.
pixabay.comVINCI HEADQUARTERS
NANTERRE, FRANCEElevators installation, 2020 - 2021
We participated in the construction of a new Vinci headquarters in Nanterre, new district of Groues in Nanterre near Paris. One of the world’s largest construction companies has builded four office buildings, including a 100 meters high tower. The project that we contracted includes the installation of modern Skyrise SD elevators from 23 to 26 stops.
© Jean-Paul Viguier et AssociésCLINICAL CENTER CHARITÉ
BERLIN, GERMANYElevators modernization, 2020
Simplex has completed an elevator modernization project in one of Europe's best university hospitals - Charité in Berlin. A thorough reconstruction of 12 elevators has been done from February to September 2020. During the modernization, the shaft installation, indicators, motors, control units and other elevator components has been changed in 3 assembly phases.
Charite Universitätsmedizin BerlinDUO TOWERS
PARIS, FRANCEElevators installation, 2020 - 2021
In 2021 we have finished a project in another iconic building in Paris - Duo towers. Famous architect Jean Nouvel designed an innovative twin-tower in the Bruneseau-Masséna district of Paris. Simplex has installed 15 elevators from 10 to 18 floors with a capacity of 1000 to 1600 kilograms and speeds from 4 to 6 m/s.
Atelier Jean NouvelHEKLA TOWER
PARIS, FRANCEElevators installation, 2020 - 2022
A big challenge for the Simplex team in France. In the 220-meter-tall Hekla Tower in Paris, we are installing the Shaft Climber type elevators. An innovative system designed for use in the construction phase of high-rise buildings that grows with the building. The elevator keeps on running in stages, while at the same time installation continues as the building enters a further construction phase.
In addition we have the honour to continue the work on 6 TWIN-elevators.
Atelier Jean Nouvel / EliothCIRCLE SQUARE, NO. 1, OXFORD ROAD
MANCHESTER, UKElevators installation, 2019 - 2020
A project for Simplex in the UK was located in Manchester where we have been installing elevators in the new Circle Square business and residential complex. The Simplex installed a total of 12 elevators from 2 to 19 stops, with a capacity of 800 to 2000 kilograms.
circlesquaremanchester.comCRUISE SHIP "SPIRIT OF ADVENTURE"
PAPENBURG, GERMANYElevators installation, 2019 - 2020
Simplex has completed another elevator installation project on the cruiser. We participated in equipping the new ship Spirit of Adventure of the British company Saga Cruises. We installed 13 elevators from 4 to 12 stops and capacity od 1275 kilograms.
MEYER WERFTALTO TOWER
PARIS, FRANCEElevators installation, 2018 - 2020
From november 2018 till summer 2020 our team has completed the elevator installation in the new skyscraper Alto Tower in the Paris business district of La Défense. In 150 meters high building with 38 floors and 51 000 square meters we installed 8 elevators with 37 and 39 stops.
Torre Libeskind
Milan, ItalyElevators installation, 2018 - 2020
Simplex has successfully completed the elevators installation project in Libeskind Tower. It is a business skyscraper in Milan of modern design, 175 meters high with 28 floors and 76,000 square meters. Our team has installed a total of 12 elevators with a range of 4 to 34 stops, including a fire elevator with a total capacity of 3000 kg.
libeskindtower.itHybrid Tower One Forty West
Frankfurt, GermanyElevators installation, 2018 - 2020
From 2019 to 2020, we installed elevators in the Hybrid tower One Forty West skyscraper in Frankfurt. Simplex has installed 13 elevators in the hotel and apartments tower, one of them is an elevator with 46 stations at a height of 148 meters.
Commerz Real AGSKYSCRAPER "22 BISHOPSGATE"
LONDON, UKElevators installation, 2018 - 2020
We have completed a demanding project for our team in London. "22 Bishopsgate" is the second tallest skyscraper in London with a work space for 12,000 people. We installed 8 "Mid-Rise", 4 "High-Rise" and 2 "Shuttle" elevators in one of the tallest business buildings in London with 62 storey and a height of 278 meters, which also has the two highest elevators in Europe.
Simplex d.o.o.ALTER WALL 10 – 32
HAMBURG, GERMANYElevators installation, 2018 -2019
Simplex was participating in the complete reconstruction and construction of the Alter Wall building 10-32 with the installation of 5 lifts. Alter Wall building is in the center of Hamburg, and it's a combination of the building made up of the renovated historical facade and a modern center made of glass and steel.
gmp Architekten von Gerkan, Marg und PartnerCRUISE SHIP "SPECTRUM OF THE SEAS"
PAPENBURG, GERMANYElevators installation, 2018 - 2019
10 elevators with 14 stations Simplex has installed into one of the world's five largest cruisers, 348 meters long and capacity of 4900 passengers, owned by Royal Caribbean. The first Ultra-class vessel was built in Rostock, Germany, and installation of the elevator was taking place at the Meyer Werft shipyard in Papenburg.
Royal Caribbean Cruises Ltd.TOUR LA MARSEILLAISE
MARSEILLE, FRANCEElevators installation, 2017 - 2018
A total of 9 elevators have been installed by a professional Simplex team in the new architectural pearl of French Marseille. La Marseilaise tower, 135 meters high, in the new business district of Euroméditerranée, is the largest urban renewal project in this part of Europe.
Special solution
Multi elevator
Rottweil, GermanyManaging assembly and installation, 2016 - 2017
The world's first rope-free elevator MULTI, the groundbreaking rope-free elevator system, is set to revolutionize tall building construction. MULTI combines rope-less linear motors and horizontal mobility with the many advances of TWIN elevators. This makes MULTI a valuable shuttle for optimizing traffic. A double-entrance lobby further increases MULTI’s flexibility and handling capacity.
ThyssenKruppSKYSCRAPER "SCALPEL"
LONDON, UKElevators installation, 2016 - 2018
In London's business skyscraper, Simplex has done the installation project of 10 elevators from 14 to 39 stops. 52 Lime Street, known as "Scalpel", is a new 36-floor building that will provide 37,000 sqm of business space, shopping center and restaurants.
WRBC DevelopmentQ22 - Echo tower, office building
Warsaw, PolandElevators installation, 2016
In 2016, Simplex installed 12 elevators on the construction site of the Q22 office building in Warsaw. It is a 155 meter high new skyscraper in the capital of Poland that is developing Echo Investment in the business center.
Maciej Czarnota czarnota.orgTower Odeon Residential Building
MonacoElevators installation, 2014
Simplex participated in the project of building and equipping the tallest building in Monaco. It's a luxurious skyscraper - the Odeon Tower. Simplex installed 4 elevators, 2 highrise elevators with 36 stations and 2 highrise elevators with 34 stations.
Majunga tower office building
Paris, FranceElevators installation, 2014
Simplex installed 26 elevators in Majunga Tower - an office building in the Parisian district of La Défense. With 16 highrise elevators, the company installed the world's first Shaft-climber - an elevator for high-performance construction sites on High-rise buildings.
Takuji_SjhimmuraIntesa SanPaolo, head office
Turin, ItalyElevators installation, 2012
Simplex was a partner in the construction project of 166-meter high skyscraper in the Italian Turin. A total of 17 high-rise and 9 lowrise elevators are installed into the skyscraper of the new generation of famous Italian architect Renzo Piano.
Simplex d.o.o.Altra Sede - government building of the region Lombardy
Milan, Italy
Elevators installation, 2008
A total of 32 elevators, of which 26 is personal elevators and 6 freight elevators, have been installed in the new "Altra Sede" building in Milan. Palazzo Lombardia was built as the new headquarters of the Lombardy Regional Government.
Simplex d.o.o.Other projects
Elevators installation and modernization
Through more than 15 years of operation, Simplex has successfully completed dozens of elevator installation projects in foreign markets. We have implemented many demanding projects throughout Europe and the world. In addition to installing Simplex, it also modernizes elevators in foreign markets.